oil & gas

Seawater piping; helideck drains and gutter repairs on accommodation; anchor bolster repairs; anchor repairs; ducting for electrical motor over rotary table; supply and fit grating to columns.

Fabrication of a new 5″ schedule 80 pipe line to allow the ship to transport and supply jet fuel to helicopters in oil rigs.

Installation and alignment of 2 x 170 ton electric winches. Piping outfitting and installation of all winches auxiliary mechanical and electrical machinery.