STEP-Consolidated

General Terms & Conditions

The content of this site is provided with the intent of conveying general information regarding STEP Group and does not constitute the provision of services.

Liability

STEP Group will not be liable for any damages that may occur due to the information contained in this site. This site has the objective of informing and the permanent updatedness of the content is not guaranteed.

STEP Group has carefully compiled the contents on this website. Access to and use of this website, as well as web sites related or connected to this by links or other, are at the user’s own risk and responsibility. Damage and warranty claims arising from missing or incorrect data are excluded.

Copyright & Trademarks

STEP Group authorizes the downloading and temporary storage of the content of this site for the purpose of its viewing on a personal computer or monitor.  The copying, permanent storage and retransmission of the content of this site is strictly forbidden without the prior written authorization of Step Consolidated, Lda. All rights related to this site belong exclusively to Step Consolidated, Lda.

General Terms & Conditions

The content of this site is provided with the intent of conveying general information regarding STEP Group and does not constitute the provision of services.

Liability

STEP Group will not be liable for any damages that may occur due to the information contained in this site. This site has the objective of informing and the permanent updatedness of the content is not guaranteed.
STEP Group has carefully compiled the contents on this website. Access to and use of this website, as well as web sites related or connected to this by links or other, are at the user’s own risk and responsibility. Damage and warranty claims arising from missing or incorrect data are excluded.

Copyright & Trademarks

STEP Group authorizes the downloading and temporary storage of the content of this site for the purpose of its viewing on a personal computer or monitor.  The copying, permanent storage and retransmission of the content of this site is strictly forbidden without the prior written authorization of Step Consolidated, Lda. All rights related to this site belong exclusively to Step Consolidated, Lda.

Below is a sample of 62 projects from a total of 685 projects done by STEP in the last six years.

ProjectYearCountryService 1Service 2Market
Fabrication on site2014SingaporePipe workBoilerOil & Gas
Container Ship2014SpainElectrical workMarine
Turbo Charger2014GermanyMechanicalMarine
BWT's2014USAElectrical workPipe workMarine
Repair on site2014SwedenWeldingBoilerIndustrial
Tanker2014TogoWeldingMarine
Reefer Vessel2014AntwerpWeldingBoilerMarine
Cruise Ship2014GreeceSteel workMarine
Tanker2014PanamaWeldingBoilerMarine
Skid2014CanadaElectrical workPipe workIndustrial
Boiler repair2014EgyptWeldingBoilerMarine
Boiler repair2014BelgiumWeldingBoilerMarine
Skid descomminsing2014DenmarkElectrical workPipe workIndustrial
Boiler2014DublinBoilerWeldingMarine
Boiler2014CanadaBoilerWeldingMarine
Cruise ship2014SpainSteel workMarine
Boiler2014ChinaWeldingBoilerMarine
LPG Tanker2014USA-ColombiaSteel workMarine
LPG Tanker2014BelgiumSteel workMarine
Boiler2014PolandBoilerMarine
Boiler2014South KoreaBoilerMarine
Boiler2013NamibiaBoilerMarine
Boiler2013USABoilerMarine
Pipe repair (stainless steel)2013DenmarkPipe workIndustrial
Boiler2013Las PalmasBoilerMarine
Boiler2013SingaporeBoilerMarine
Boiler2013New CaledoniaBoilerMarine
Boiler2013TurkeyBoilerMarine
Boiler2013NetherlandsBoilerMarine
Steel Work 2013GibraltarWeldingMarine
Pipe Work 2013BahamasWeldingMarine
Pipe Work 2013AberdeenWeldingMarine
Pipe Work 2013NamibiaWeldingMarine
Steel Work 2013Saudi ArabiaWeldingMarine
Pipe Work 2013USAPipe workMarine
Electrical work 2013FranceElectricalMarine
Electrical work 2013UkraineElectricalMarine
Spools fabrication2013South AfricaPipe workOil & Gas
Industrial Plant2013DenmarkPipe workIndustrial
Boiler2012BelgiumElectricalMarine
Boiler2012South AfricaWeldingMarine
hatch cover repair2012ItalyWeldingMarine
Pipe repair 2012USAPipe workMarine
Craine repair 2012South KoreaElectricalMarine
Pipe repair 2012ArgentinaPipe workMarine
Boiler2012AustraliaBoilerMarine
Boiler2012SingaporeBoilerMarine
Spools fabrication2012BrazilWeldingOil & Gas
Spools Instalation2012BrazilPipe workOil & Gas
Spools Instalation2012NorwayPipe workOil & Gas
LPG Tanker2012Dominican RepublicPipe workMarine
Boiler2012OmanElectricalMarine
Boiler2012Sri LankaElectricalMarine
Energie Project AB2011IrelandBoilerWeldingIndustrial
Maersk Battler2011NamibiaSteel workPipe workMarine
Industrial Boiler repair2010GreeceBoilerIndustrial
Industrial Boiler repair2010GreeceBoilerIndustrial
Industrial Boiler repair2010SwedenBoilerIndustrial
GSF Rig 1402009NamibiaPipe workWeldingOil & Gas
Rig Sedneth 7012009NamibiaSteel workWeldingOil & Gas
Monthey Thermal Boiler2009SwitzerlandSteel workWeldingIndustrial
Hercules Oil Rig2009NamibiaWeldingSteel workOil & Gas

 icon-marine2Marine  icon-marine-on_voyageMarine – on voyage icon-oilandgasOil & Gas icon-industryIndustry

 

 

Marine
Generator repair

Integral block replacement of Diesel Engine type MAN D 2876 LE 301.  The generator block and cylinder nº 4 were broken with the piston out. The injection system not working, pump also broken.

download PDF file

Cylinder Head overhaul

Overhaul of a MaK M43C Main Engine, Cylinder Head, including dimensional control and pressure test.

download PDF file

 
Alternator Overhaul

Integral alternator overhaul, including bearings replacement, rotor and stator cleaning, diodes ckecking and shaft alignment .

download PDF file
Tall ship cruise

Tall ship cruise in dry dock for Class renewal.

download PDF file
Mechanical work

Perform overhaul in Main Engine, air compressors and air bottles. Repair oil coolers, air coolers and fresh water coolers. Replace thermal insulation. Perform overhaul in engine room valves and pumps.

download PDF file
Pipe Work in Dry Dock

LPG Tanker vessel in dry dock for Class renewal survey.

download PDF file
Boiler Fabrication
Boiler fabrication

Repair and fabrication of combined exhaust gas boiler in southern Spain.

download PDF file
Pipe work
Pipe work

Replacement of pipe work in engine room and deck, modify cargo lines, overhaul valves in engine room and PV valves in cargo tanks. Repair of boilers and incinerators. Fabrication of funnels.

download PDF file
Riding Squads
Riding squads

Upgrade of MGO boiler supply systems of several oil tankers. All jobs were performed on board and while sailing.

download PDF file
Steel Work
Steel work

Fabrication of complete new forepeak.

download PDF file
EGB Fabrication
EGB fabrication

Fabrication of exhaust gas boiler and installation on board the vessel.

download PDF file

 

Oil & Gas
Modification
Modification

Installation and alignment of 2 x 170 ton electric winches. Piping outfitting and installation of all winches auxiliary mechanical and electrical machinery.

download PDF file
ITC cyclone
ITC Cyclone

Fabrication of a new 5″ schedule 80 pipe line to allow the ship to transport and supply jet fuel to helicopters in oil rigs.

download PDF file
 RIG 140
 RIG 140

Seawater piping; helideck drains and gutter repairs on accommodation; anchor bolster repairs; anchor repairs; ducting for electrical motor over rotary table; supply and fit grating to columns.

 download PDF file

 

Industrial
20” Spools Fabrication

 Fabrication of two 20” spools in our workshop in Lisbon.

download PDF file
Buffer Tank
Buffer tank

Calculation, design and fabrication of 1x40m3 Buffer Tank according to DNV rules.

download PDF file
Duplex
Duplex

Fabrication of a super duplex spools in our workshop in Lisbon to send to Norway for skid installation.

download PDF file
Steam Boiler plant
Steam boiler plant

Fabrication in our workshop in Lisbon of steam boiler plant in accordance with CE Directive PED 97/23/CE, code EN 12953.

download PDF file

 

Marine
Generator repair

Integral block replacement of Diesel Engine type MAN D 2876 LE 301.  The generator block and cylinder nº 4 were broken with the piston out. The injection system not working, pump also broken.

download PDF file

Cylinder Head overhaul

Overhaul of a MaK M43C Main Engine, Cylinder Head, including dimensional control and pressure test.

download PDF file

 
Alternator Overhaul

Integral alternator overhaul, including bearings replacement, rotor and stator cleaning, diodes ckecking and shaft alignment .

download PDF file
Tall ship cruise

Tall ship cruise in dry dock for Class renewal.

download PDF file
Mechanical work

Perform overhaul in Main Engine, air compressors and air bottles. Repair oil coolers, air coolers and fresh water coolers. Replace thermal insulation. Perform overhaul in engine room valves and pumps.

download PDF file
Pipe Work in Dry Dock

LPG Tanker vessel in dry dock for Class renewal survey.

download PDF file
Boiler Fabrication
Boiler fabrication

Repair and fabrication of combined exhaust gas boiler in southern Spain.

download PDF file
Pipe work
Pipe work

Replacement of pipe work in engine room and deck, modify cargo lines, overhaul valves in engine room and PV valves in cargo tanks. Repair of boilers and incinerators. Fabrication of funnels.

download PDF file
Riding Squads
Riding squads

Upgrade of MGO boiler supply systems of several oil tankers. All jobs were performed on board and while sailing.

download PDF file
Steel Work
Steel work

Fabrication of complete new forepeak.

download PDF file
EGB Fabrication
EGB fabrication

Fabrication of exhaust gas boiler and installation on board the vessel.

download PDF file
Oil & Gas
Modification
Modification

Installation and alignment of 2 x 170 ton electric winches. Piping outfitting and installation of all winches auxiliary mechanical and electrical machinery.

download PDF file
ITC cyclone
ITC Cyclone

Fabrication of a new 5″ schedule 80 pipe line to allow the ship to transport and supply jet fuel to helicopters in oil rigs.

download PDF file
 RIG 140
 RIG 140

Seawater piping; helideck drains and gutter repairs on accommodation; anchor bolster repairs; anchor repairs; ducting for electrical motor over rotary table; supply and fit grating to columns.

 download PDF file
Industrial
20” Spools Fabrication

 Fabrication of two 20” spools in our workshop in Lisbon.

download PDF file
Buffer Tank
Buffer tank

Calculation, design and fabrication of 1x40m3 Buffer Tank according to DNV rules.

download PDF file
Duplex
Duplex

Fabrication of a super duplex spools in our workshop in Lisbon to send to Norway for skid installation.

download PDF file
Steam Boiler plant
Steam boiler plant

Fabrication in our workshop in Lisbon of steam boiler plant in accordance with CE Directive PED 97/23/CE, code EN 12953.

download PDF file

STEP in the world

STEP’s headquarters is located in Portugal, in the heart of Lisbon’s Harbour, inside Naval Rocha’s Shipyard. This location is easily accessible and is ideal to any vessels passing through Atlantic, Mediterranean waters and the West African coast.

The Naval Rocha´s shipyard has two dry docks. The largest dock entrance is of 170m x 22,5m and the smaller is 104m x 13m. The pier is 120m x 4m. There is a rail crane and fixed crane, as well as several mobile cranes. The total area of workshops is of 2.800m2, including mechanical, pipe and steel working facilities.

Here we have facilities for the fabrication of Boilers, Pressure Vessels, Piping and Steel Structures – including Technical Backup to support the shipyard at all levels.

STEP is committed in providing to its customers solutions that meet the environment regulations and legislation requirements. With our specialized personnel and expertise we are able to help them to be environmentally friendly.

> Ballast Water Treatment
> Exhaust Gas Scrubbing

green technologies
Green technologies

Submit a service enquiry

* indicates required field

Acceptable file types: pdf.
Maximum file size: 2mb.

Powered by Fast Secure Contact Form

Our offices

Lisbon, Portugal
(Headquarters)
Estaleiro da Rocha Conde de Óbidos, Edifício C
1350-352 Lisboa
Portugal
Tel: +351 212 742 817
Fax: +351 213 905 345
e-mail: office@step-consolidated.com

Cernavoda, Romania
Strada Seimeni BI. S1, Sc B, Ap. 21 Parter
905200 Cernavoda
Romania
e-mail: office@step-consolidated.com